development · Jan 30, 2026 · updated Sep 11, 2026

Villa Miami Construction Reaches 21 Floors in Edgewater

Construction at Villa Miami has reached the 21-floor mark, moving the project toward a late 2027 completion date with high-end amenities and a waterfront restaurant.

Construction Progress in Edgewater

Construction at Villa Miami has reached the 21-floor mark. The project, located at 710 NE 29th Street in the Edgewater neighborhood, is a 56-story, 650-foot residential tower. According to Florida YIMBY, the project is scheduled for completion in late 2027.

Project Details and Amenities

The development, designed by ODP Architects with interior design by Vicky Charles of AD100, will feature 70 condominium residences. These units will consist of full-floor and half-floor layouts. A penthouse residence on the upper levels of the building is valued at $55 million.

For residents, the building will include The Copper Club, a three-level private amenity suite. This suite features dining rooms, lounges, wellness facilities, a screening room, a salon, and a rooftop helipad. Additionally, a ground-floor waterfront restaurant operated by Major Food Group is planned for the site.

Local Context and Inventory

Villa Miami is situated in a dense area of Edgewater with several active projects nearby. The Edgewater neighborhood currently has 326 active condo listings, with a median asking price of $944,500 ($856/sq ft) and 281 sales in the last 12 months, according to Own Miami data.

Nearby options for buyers include Cove Miami, which has 6 active listings from $795,000 at a median asking of $1,067/sq ft, and Icon Bay, which has 13 active listings from $635,000 at a median asking of $708/sq ft. Other nearby options include The Crimson with 5 active listings from $510,000 at a median asking of $628/sq ft, and Platinum with 4 active listings from $529,000 at a median asking of $507/sq ft. Biscayne Beach has 20 active listings from $595,000 at a median asking of $898/sq ft.

Sources

Florida YIMBY: https://floridayimby.com/2026/01/villa-miami-reaches-21-floors-above-biscayne-bay-at-710-ne-29th-street-in-edgewater.html

Frequently asked questions

When is Villa Miami scheduled to be completed?+

The project is scheduled for completion in late 2027.

How many units are in the Villa Miami development?+

The development will feature 70 condominium residences consisting of full-floor and half-floor layouts.

What amenities are included at Villa Miami?+

The building includes The Copper Club, a three-level private amenity suite with dining rooms, lounges, wellness facilities, a screening room, a salon, and a rooftop helipad. There is also a planned ground-floor waterfront restaurant.

How much is the penthouse residence at Villa Miami?+

A penthouse residence on the upper levels of the building is valued at $55 million.

#Edgewater#Villa Miami#New Construction

More Edgewater news